Rio Grande Substation Investigation
This project involved assessing three existing lattice structures to accommodate new loads resulting from the rearrangement of transmission lines due to a new generator installation. Our services encompassed conducting an as-built survey, analyzing the structure using a 3Dmodel, and delivering construction documents outlining necessary modifications. By following our recommendations, we successfully arranged the conductors to enable our client to preserve the existing structure, eliminating the need for replacement.